pageheader_racinefromloomis_eisenhower_blueline_westside

Blue Line Forest Park Branch Feasibility/Vision Study

This page provides information regarding the CTA’s Blue Line Forest Park Branch Feasibility/Vision Study, process, and schedule.

On this page

Project overview

Project background

The Chicago Transit Authority (CTA) initiated the Blue Line Forest Park Branch Feasibility/Vision Study in 2013 to determine a long-term planning strategy for the Blue Line Forest Park Branch, with study limits including the entire Blue Line Forest Park Branch from Clinton station to Forest Park station, including the evaluation of potential expansion alternatives proposed by the Illinois Department of Transportation (IDOT) through their adjacent I-290 Environmental Impact Statement (EIS) Study that continues to Mannheim Road. CTA’s Blue Line Forest Park Branch Feasibility/Vision Study concluded in 2017.

The Blue Line Forest Park Branch Feasibility/Vision Study includes an assessment of transit and highway integrated enhancements, regional mobility issues, and identification of funding sources and future collaboration opportunities. Concepts for all stations in the study area include, but are not limited to, station access, redesign opportunities, and right-of-way (ROW) needs at specific stations along the corridor. The study includes innovative solutions that preserve transit, but also integrate highway and transit operations to maximize mobility in this important regional corridor.

A map showing the study area bounded by a dotted red line.
The Blue Line Forest Park Branch Feasibility/Vision Study area includes the CTA Blue Line Forest Park branch and an expanded area to the west to evaluate proposed IDOT high-capacity transit expansion alternatives. Specifically, from east to west, the study area is from Canal Street (one block east of Clinton Station) to Mannheim Road. From north to south, the study area is from Roosevelt Road to Madison Street.

Study process

1: Data Collection and Existing Conditions Assessment
This stage of the project development process included: assessing existing conditions and deficiencies within the study area corridor; reaching out to local stakeholders and other interested parties about the project; and hosting a public open house to identify study area issues/concerns.

2: Develop Conceptual Alternatives
This stage of the project consisted of the development and analysis of project alternatives. The goal of this step was to identify a series of alternatives and potential solutions that are suitable to meet the project and stakeholder goals that were identified in Step One.

3: Evaluate and Refine Alternatives
The process concluded with the evaluation and refinement of the corridor service alternatives and recommendations.

Project schedule

Data collection in 2013. Spring 2013: Station concepts development. Late 2013: Station concepts evaluation. IDOT Corridor Advisory Group meeting. Fall 2013: Corridor service evaluation. Late 2013: Public meeting/public hearings yearly. Late 2017: Public meeting/public hearing. Study completion in 2017.

Public Involvement

Introduction

Stakeholder involvement was a key component of the Forest Park Branch Feasibility/Vision Study. A stakeholder is defined as anyone who could be affected by the project and has a stake in its outcome. CTA gathered focused and direct input from all interested stakeholders throughout the study process.

CTA’s public involvement process provided information, including project status updates, and several opportunities for feedback regarding upcoming public meeting events and project schedule.

Outreach meetings

The Blue Line Forest Park Branch Feasibility/Vision Study included stakeholder outreach to solicit input on and achieve a general understanding of the issues, and to identify potential solutions for the project. Stakeholder outreach was coordinated with the I-290 EIS, and Blue Line Feasibility/Vision Study findings and input opportunities were added to IDOT’s stakeholder outreach program. CTA provided project updates at Public Meetings held in 2013, and participated in IDOT’s I-290 EIS Corridor Advisory Group meetings held throughout 2013, 2014, 2015 and 2016. The outreach process concluded with a joint CTA/IDOT Open House on June 29, 2016 and a Public Hearing in January 2017, in coordination with IDOT’s I-290 EIS Study, where CTA and IDOT jointly presented final study recommendations from the two projects in the multimodal corridor.

Community members and other project stakeholders were able to share their thoughts and concerns at the outreach meetings. Questions raised by meeting participants were either answered immediately or addressed in subsequent meetings, letters or other communication mechanisms. All comments received at the public meetings were documented, and that information informed the analysis and evaluation of the proposed alternatives. Individuals on the mailing list were notified of meeting dates and times throughout the study.

Outreach materials from past meetings

Study Documents

Blue Line Forest Park Branch Feasibility/Vision Study project documents are available below. These documents include draft and final reports; study area maps; presentations; and FAQs, glossary of terms, project photos, graphics, and other communication materials.

System status snapshot
‘L’ route status
Red Line
Normal Service
Blue Line
Normal Service
Green Line
Normal Service
Orange Line
Normal Service
Pink Line
Normal Service
Purple Line
Normal Service
Yellow Line
Normal Service
Bus routes w/alerts
Elevator alerts